How Many Bags of Concrete Do You Need for a 30x30 Slab?
Quick answer: A 30x30 ft slab that is 4 inches thick holds 300 cubic feet of concrete (11.11 cubic yards). That is 500 bags of 80 lb mix with no waste, or 550 bags with a 10 percent allowance. With 60 lb bags buy 734. With 40 lb bags buy 1100. If you order a truck instead, ask for 12.25 cubic yards of ready-mix.
- Concrete mix, 80 lb bags550 bags
- Gravel, bulk (4 in base, if used)11.11 yd³
Concrete for a 30x30 slab
The slab covers 900 square feet. Concrete is sold by volume, so the surface area is multiplied by the thickness: 900 square feet at 4 inches is 300 cubic feet. At 11.11 cubic yards this is a ready-mix job for most people. 550 bags would weigh about 44,000 pounds, roughly 22 tons, and every bag has to be mixed before the first batch starts to set. A truck delivers about 12.25 cubic yards in one go. Ask your supplier about minimum loads and short-load fees.
Bags of concrete for a 30x30 slab by thickness
Thickness changes the volume in direct proportion. These figures are for 30x30 ft with 10 percent waste and 80 lb bags, with the ready-mix order in the last column.
| Thickness | Volume (ft³) | 80 lb bags | Ready-mix |
|---|---|---|---|
| 3 in | 225 | 413 | 9.25 yd³ |
| 4 in | 300 | 550 | 12.25 yd³ |
| 5 in | 375 | 688 | 15.5 yd³ |
| 6 in | 450 | 825 | 18.5 yd³ |
Four inches is a common thickness for patios, walkways and shed floors. At 6 inches the same 30x30 slab needs 825 bags. Slabs that carry vehicles or heavy loads are usually thicker and often reinforced, so confirm the thickness with your local building department before you order.
The math for a 30x30 slab
- Area. 30 ft × 30 ft = 900 square feet.
- Volume. 900 × 4 ÷ 12 = 300 cubic feet.
- Cubic yards. 300 ÷ 27 = 11.111 cubic yards.
- Waste. 300 × 1.10 = 330 cubic feet.
- Bags. An 80 lb bag yields about 0.6 cubic feet, so 330 ÷ 0.6 = 550, which rounds up to 550 bags.
The 10 percent allowance is a common rule of thumb for uneven ground, flexing forms and mix left in the tools. Without it you would need 500 bags, so the allowance adds 50.
What else a 30x30 slab needs
- Gravel base. A 4 inch base under the slab is about 11.11 cubic yards of gravel.
- Forms. The edge of the slab is 120 feet long. That is 15 boards of 8 feet, or 10 boards of 12 feet, before you cut corners and overlaps.
- Reinforcement and joints. Wire mesh or rebar, and control joints, depend on local code and how the slab will be used.
- Curing. Keep the slab damp or covered for several days so it gains strength.
For bag sizes, waste and the bags-or-truck decision in more detail, read how many bags of concrete for a 10x10 slab.
Nearby slab sizes
Sizes close to 30x30 ft, with the same 4 inch thickness and 10 percent waste:
| Slab size | Area | 80 lb bags | Ready-mix |
|---|---|---|---|
| 24x24 ft | 576 ft² | 352 | 8 yd³ |
| 20x30 ft | 600 ft² | 367 | 8.25 yd³ |
| 24x30 ft | 720 ft² | 440 | 10 yd³ |
| 30x40 ft | 1200 ft² | 734 | 16.5 yd³ |
Keep going
- The Concrete slab calculator lets you enter any size.
- How many bags of concrete for a 10x10 slab explains bag sizes and ready-mix in full.
- How much waste factor to add to building materials
- How to measure a room for materials
Frequently asked questions
How many bags of concrete for a 30x30 slab?
You need 500 bags of 80 lb mix with no waste and 550 with a 10 percent allowance, for a slab 4 inches thick. Buy 550.
How many 60 lb bags of concrete for a 30x30 slab?
You need 734 bags of 60 lb mix at 4 inches with 10 percent waste. A 60 lb bag yields about 0.45 cubic feet.
How many cubic yards of concrete is a 30x30 slab?
At 4 inches it is 11.11 cubic yards, or 12.22 with 10 percent waste. A supplier will usually round the order up to 12.25 cubic yards.
How many bags of concrete for a 30x30 slab 6 inches thick?
A 6 inch slab of this size needs 825 bags of 80 lb mix with 10 percent waste, or 750 with none.
Should I buy bags or ready-mix for a 30x30 slab?
At 11.11 cubic yards, a ready-mix truck is usually easier than mixing 550 bags by hand. Compare the delivery cost with the cost of the bags at your own store.

Sources and assumptions
These are the settings behind every number above. Verified figures link to a source. Editable defaults are common rules of thumb: change them in the calculator to match your product and your site.
| Setting | Value | Status | Source |
|---|---|---|---|
| concrete bag yield 80lb | 0.6 ft3 | Verified 2026-11-13 | QUIKRETE data sheets list about 0.60 cubic feet per 80 lb bag (for example the Crack Resistant Concrete Mix 1006-80). Yield varies a little by product and by how wet… |
| concrete bag yield 60lb | 0.45 ft3 | Verified 2026-11-13 | QUIKRETE 5000 High Early Strength data sheet: a 60 lb bag yields about 0.45 cubic feet. Yield varies a little by product. |
| concrete bag yield 40lb | 0.3 ft3 | Verified 2026-11-13 | QUIKRETE Concrete Mix 1101 data sheet: a 40 lb bag yields approximately 0.30 cubic feet (8.5 L). Yield varies a little with water content. |
| concrete slab waste | 0.1 fraction | Editable default | Common contractor rule of thumb (about 5-10% for spillage and uneven ground). Editable by the user. Not an official figure. |
| readymix order increment | 0.25 yd3 | Editable default | Assumed ordering step for ready-mix; real minimums vary by supplier. Rule of thumb, not verified. |
| concrete readymix threshold | 1 yd3 | Editable default | Above about 1 cubic yard, ready-mix delivery is usually more practical than bags. Rule of thumb, not verified. |
Other sizes
- Concrete for a 24x24 slab352 bags of 80 lb mix, or 8 cubic yards ready-mix.
- Concrete for a 20x30 slab367 bags of 80 lb mix, or 8.25 cubic yards ready-mix.
- Concrete for a 24x30 slab440 bags of 80 lb mix, or 10 cubic yards ready-mix.
- Concrete for a 30x40 slab734 bags of 80 lb mix, or 16.5 cubic yards ready-mix.
- Concrete slab calculatorEnter any size and see every step of the math.