Retaining wall blocks calculator

Blocks, cap blocks and drainage gravel for a segmental retaining wall from its length and height.

Open the interactive calculator

Retaining wall blocks needed by size

LengthMain resultShopping list
10 ft77 blocks77 blocks Wall blocks (12 x 6 in face); 11 caps Cap blocks; 1.5 yd³ Gravel, bulk (backfill)
25 ft193 blocks193 blocks Wall blocks (12 x 6 in face); 28 caps Cap blocks; 3.5 yd³ Gravel, bulk (backfill)
50 ft385 blocks385 blocks Wall blocks (12 x 6 in face); 55 caps Cap blocks; 6.5 yd³ Gravel, bulk (backfill)
100 ft770 blocks770 blocks Wall blocks (12 x 6 in face); 110 caps Cap blocks; 12.5 yd³ Gravel, bulk (backfill)
150 ft1,155 blocks1,155 blocks Wall blocks (12 x 6 in face); 165 caps Cap blocks; 18.5 yd³ Gravel, bulk (backfill)
200 ft1,540 blocks1,540 blocks Wall blocks (12 x 6 in face); 220 caps Cap blocks; 24.5 yd³ Gravel, bulk (backfill)

Every other setting is at the calculator's default. Change them in the calculator for your own job.

Worked example

Using the default sizes, the result is 154 blocks (7 courses of 20, plus 22 cap blocks).

ItemQuantityNote
Wall blocks (12 x 6 in face)154 block7 courses of 20, includes 10% waste
Cap blocks22 capOne cap row along the top
Gravel, bulk (backfill)2.5 yd³ordered in 0.5 yd³ steps

How it is calculated

  1. Courses: ceil(height × 12 ÷ block height) + buried base courses
    ceil(3 × 12 ÷ 6) + 1 = 7 courses
  2. Blocks per course: ceil(length × 12 ÷ block width)
    ceil(20 × 12 ÷ 12) = 20 blocks
  3. Blocks without waste: courses × blocks per course
    7 × 20 = 140 blocks
  4. Blocks with waste: blocks × (1 + waste), rounded up
    140 × 1.10 = 154 blocks
  5. Backfill gravel: length × height × thickness, with waste
    20 × 3 × 1.00 ÷ 27 × 1.10 = 2.44 yd³

What to enter

FieldUnitHelp
Wall lengthftLength along the wall.
Wall heightftVisible height of the finished wall.
Block width (along the wall)inWidth of one block face, from the product label.
Block heightinHeight of one block (one course), from the product label.
Buried base coursescoursesThe first course is set below grade on a compacted gravel base. One buried course is common for low walls.
Gravel backfill thicknessinDrainage gravel behind the wall. Depends on the product and design.
Extra for waste%Breakage and cut blocks.

Before you buy

Frequently asked questions

How do I calculate retaining wall blocks?

Blocks, cap blocks and drainage gravel for a segmental retaining wall from its length and height. Enter your sizes in the calculator. It works out courses (ceil(height × 12 ÷ block height) + buried base courses) and the later steps, then rounds up to what stores sell.

How much waste should I add?

The calculator starts at 10%. Source: Contractor rule of thumb. Not verified. You can change it. More cuts, patterns or uneven ground need more.

Where does the retaining wall waste number come from?

10 percent. Contractor rule of thumb. Not verified. This is an editable starting value, not an official figure. Change it if your product label or supplier says otherwise.

Where does the bulk order increment number come from?

0.5 yd3. Assumed ordering step for bulk gravel, mulch, soil and sand; yards differ. Rule of thumb, not verified. This is an editable starting value, not an official figure. Change it if your product label or supplier says otherwise.

Does this calculator show prices?

No. It gives quantities and a shopping list you can share, print or export. Ask your supplier for prices.

Can I build from this estimate?

No. It is a planning estimate. Structural parts depend on local code, soil and loads. Check local code and ask a licensed professional.