By the EnoughToBuy teamUpdated November 15, 20263 min readSources and assumptions

Quick answer: A 400 ft picket fence with posts every 8 ft needs 51 posts, 880 pickets and 100 rails, plus 102 bags of 80 lb concrete if each post is set in 2 bags. The pickets are 5.5 inches wide with a half inch gap and include 10 percent waste.

Try itFence: enter your own sizes
You would buy51posts
  • Posts51 posts
  • Pickets880 pickets
  • Rails100 rails
  • Concrete mix for post holes, 80 lb bags102 bags
Open the full calculator with more options

Fence materials for 400 feet

At 400 feet this is a long run, so check the ground for slope and plan the delivery of 880 pickets.

ItemQuantityHow it is worked out
Posts5150 sections plus 1
Pickets880800 pickets plus 10% waste
Rails10050 sections × 2 rails
80 lb concrete bags10251 posts × 2 bags

A run of 400 feet usually has at least one corner or gate. Count each straight run on its own, then subtract one post for every corner, because the corner post is shared by two runs.

~8 ft 400 ft, 50 sections
A 400 ft fence line with posts every 8 ft: 50 sections and 51 posts.

The math for 400 feet of fence

  1. Sections. 400 ÷ 8 = 50, rounded up to 50 sections.
  2. Posts. One more than the sections: 50 + 1 = 51 posts.
  3. Pickets. 5.5 + 0.5 = 6 inches per picket, so 2 pickets per foot. 400 × 2 = 800, and with 10 percent waste 880 pickets.
  4. Rails. 50 sections × 2 rails = 100 rails.

Without the waste allowance the fence needs 800 pickets. The extra 80 cover cuts, splits and mistakes.

Posts and rails for 400 feet by post spacing

Closer posts make a stronger fence but use more posts, rails and concrete.

Post spacingPostsRailsConcrete bags
6 ft68134136
8 ft51100102
10 ft418082
Rails per sectionRails for 400 ft
2 rails100
3 rails150
4 rails200

A fence of about 4 feet usually has 2 rails per section, and taller fences use 3 or 4. Check your design or the instructions of your rails.

400 feet of fence with gates

A gate opening is not covered by pickets, so the calculator takes the gate width out of the fenced run and adds the gate posts.

GatesPostsPicketsRails
No gate51880100
1 gate (4 ft)52872100
2 gates (4 ft)5286398

Gate hardware, such as hinges, a latch and a frame, is a separate purchase. Gate posts usually need to be heavier than line posts.

Laying out 400 feet of posts

Posts at exactly 8 feet leave a short last section: 49 sections of 8 feet and one of 8 feet. To avoid the short section, space the 50 sections evenly at 8 feet instead. Stretch a string line along the fence line, mark each post position on the ground, and check the marks against the property line before you dig.

On a slope, measure along the ground rather than on a map, because the fence length along a hill is longer than the horizontal distance. Call 811 a few working days before digging so underground lines are marked.

Nearby fence lengths

Fence lengthPostsPicketsRails
200 ft2644050
250 ft3355064
300 ft3966076
500 ft641100126

Keep going

Frequently asked questions

How many fence posts for 400 feet?

With posts 8 feet apart you need 51 posts: 50 sections plus one. At 6 feet spacing you need 68 and at 10 feet you need 41.

How many pickets for 400 feet of fence?

880 pickets of 5.5 inches with a half inch gap and 10 percent waste. Without waste, 800.

How many rails for 400 feet of fence?

With 2 rails per section you need 100 rails. With 3 rails per section you need 150.

How many bags of concrete for 400 feet of fence posts?

About 102 bags of 80 lb mix if each of the 51 posts takes 2 bags. The real amount depends on the hole size and depth.

How many fence panels for 400 feet?

Prefabricated panels are sold in set widths, often 6 or 8 feet. Divide 400 by the panel width and round up, then add one post more than the number of panels.

How Many Fence Posts and Pickets Do You Need for 400 Feet?
Save or share this answer.

Sources and assumptions

These are the settings behind every number above. Verified figures link to a source. Editable defaults are common rules of thumb: change them in the calculator to match your product and your site.

SettingValueStatusSource
fence post spacing8 ftEditable defaultcontractor rule of thumb, editable
fence rails per section2 rails/sectionEditable defaultcontractor rule of thumb, editable
fence post concrete bags2 bag/postEditable defaultRule of thumb for 80 lb concrete bags set per fence post hole; depends on hole size. Not verified.

Other sizes